HUATAOHUATAO | Wood-Based Panel Production

Belt selection and specification checklist

Match the production stage, installed belt configuration and operating limits.

1. Determine the application

Record the panel type and production stage: forming, pre-pressing, deaeration or transfer.

2. Check the specification

Collect the full belt code, width, nominal length, thickness, surface, splice and smallest pulley diameter.

3. Confirm operating requirements

Provide temperature, load and, where applicable, required permeability with test pressure.

4. Prepare the inquiry

Send a label photo or drawing, quantity and destination. Ask for the current model sheet and applicable inspection documentation.